2100-2102 Gold Coast Highway, Miami
Development
DA APPROVED ON PRIME MIAMI DEVELOPMENT SITE
Current DA Approval in place for a four-level residential building comprising of 12 luxury apartments with a mixture of two and three-bedrooms.
The site is ideally positioned within walking distance to Miami Beach, Miami One Shopping Centres (Coles) , Miami Marketta, North Burleigh, Miami High School and Nobbys Precinct.
The light rail extension from Broadbeach to Burleigh Heads is currently under construction ( completion due 2024 ). This site is located within 300 metres of both Miami and Miami North stations
Key Site Features
- Land Size 810m²
- Medium Density Residential (RD5)
- Height Limit 15m
- Wide 20m Street Frontage
Disclaimer: The above information has not been verified. We advise you confirm the accuracy of details before entering into a contract.
Amir Prestige and its employees cannot be held responsible for any inaccurate details supplied here.
The site is ideally positioned within walking distance to Miami Beach, Miami One Shopping Centres (Coles) , Miami Marketta, North Burleigh, Miami High School and Nobbys Precinct.
The light rail extension from Broadbeach to Burleigh Heads is currently under construction ( completion due 2024 ). This site is located within 300 metres of both Miami and Miami North stations
Key Site Features
- Land Size 810m²
- Medium Density Residential (RD5)
- Height Limit 15m
- Wide 20m Street Frontage
Disclaimer: The above information has not been verified. We advise you confirm the accuracy of details before entering into a contract.
Amir Prestige and its employees cannot be held responsible for any inaccurate details supplied here.